Glen Arbor Sun
  • Link to Facebook
  • Link to Instagram
  • Link to Rss this site
  • Stories
    • Business Feature
    • Dispatch from Afar
    • Food/Organic Living
    • Historical Feature
    • Investigative Article
    • Local Personality
    • Poetry/Essay
    • Talk of the Town
    • Upcoming Event
    • Latest Print Editions
  • About Us
  • Advertising
  • Calendar
  • Area Links
  • Subscriptions & Email Updates
  • Contact
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu

Crystal River culvert

Posts

Crystal River culvert replacement project resumes

Upcoming Event

GTEC USA will resume its Crystal River culvert replacement work on June 15 at the crossing near the corner of M-22 and County Road 675, close to The Mill. This project will include removal of the existing culverts and replacement with a 65-foot steel bridge by the end of August. CR 675 will be closed to thru traffic from M-22 to S Westman Road, and rerouted for the duration of the project. Two previous Crystal River culvert projects were completed last year.

Read more

Share this:

  • Share
  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X
  • Email a link to a friend (Opens in new window) Email
  • Share on Reddit (Opens in new window) Reddit
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Print (Opens in new window) Print
  • Share on Tumblr (Opens in new window) Tumblr
June 11, 2025/by editor
https://glenarborsun.com/wp-content/uploads/2024/11/CrystalRiverBridge.jpg 1132 2000 editor https://glenarborsun.com/wp-content/uploads/2023/06/Glen-Arbor-Sun-Glen-Arbor-Michigan.png editor2025-06-11 13:17:402025-06-11 13:17:40Crystal River culvert replacement project resumes

Crystal River culvert work along County Road 675 to resume this fall

Upcoming Event

Grand Traverse Engineering and Construction and the Leelanau County Road Commission have announced that roadwork to improve Crystal River stream crossings along County Road 675, northeast of Glen Arbor, will resume late this summer or early this fall. The culverts where kayakers on the Crystal River gleefully “shoot the tube” are next on the list. Click here to read more and to view a map of the project.

Read more

Share this:

  • Share
  • Share on Facebook (Opens in new window) Facebook
  • Share on X (Opens in new window) X
  • Email a link to a friend (Opens in new window) Email
  • Share on Reddit (Opens in new window) Reddit
  • Share on Pinterest (Opens in new window) Pinterest
  • Share on LinkedIn (Opens in new window) LinkedIn
  • Print (Opens in new window) Print
  • Share on Tumblr (Opens in new window) Tumblr
April 22, 2024/by editor
https://glenarborsun.com/wp-content/uploads/2021/11/Crystal_Piping_around_culvert-web.jpg 1080 1920 editor https://glenarborsun.com/wp-content/uploads/2023/06/Glen-Arbor-Sun-Glen-Arbor-Michigan.png editor2024-04-22 22:15:432024-04-22 22:15:43Crystal River culvert work along County Road 675 to resume this fall
Leelanau.com

Search the Sun

Search Search

Categories

Archives

© Glen Arbor Sun

webdesign by leelanau.com
  • Link to Facebook
  • Link to Instagram
  • Link to Rss this site
  • Stories
  • About Us
  • Advertising
  • Calendar
  • Area Links
  • Subscriptions & Email Updates
  • Contact
Scroll to top Scroll to top Scroll to top